Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

LTO Heuristics for Capacitated Lot Sizing Problem with Sequence Dependent Setups and Overtimes

The wellknown CLSP problem is generalized including sequence dependent setup times and overtimes and modeling it as a quadratic mixed 0-1 integer programming problem called Capacitated Lot Sizing Problem with Sequence Dependent Setups and Overtimes. We develop a heuristics based on Lagrangean relaxation and tabu search for solving the problem. At the end, some computational results are presented.

متن کامل

Relax and Fix Heuristics for Simultaneous Lot Sizing and Sequencing the Permutation Flow Shops with Sequence-Dependent Setups

  This paper proposes two relax and fix heuristics for the simultaneous lot sizing and sequencing problem in permutation flow shops involving sequence-dependent setups and capacity constraints. To evaluate the effectiveness of mentioned heuristics, two lower bounds are developed and compared against the optimal solution. The results of heuristics are compared with the selected lower bound .

متن کامل

An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups

This paper presents a novel mathematical programming approach to the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and setup costs. The approach is partly based on the earlier work of Haase and Kimms [2000. Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. International Journal of ...

متن کامل

Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups

In production planning, sequence dependent setup times and costs are often incurred for switchovers from one product to another. When setup times and costs do not respect the triangular inequality, a situation may occur where the optimal solution includes more than one batch of the same product in a single period — in other words, at least one sub tour exists in the production sequence of that ...

متن کامل

Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems

We consider a family of N items that are produced in, or obtained from, the same production facility. Demands are deterministic for each item and each period within a given horizon of T periods. If in a given period an order is placed, setup costs are incurred. The aggregate order size is constrained by a capacity limit. The objective is to find a lot-sizing strategy that satisfies the demands ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2008

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207540802446787