Multiple Objectives Scheduling with JIT Theory in a Flow Shop FMS

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modelling and heuristics of FMS scheduling with multiple objectives

The performance of a scheduling system, in practice, is not evaluated to satisfy a single objective, but to obtain a trade-off schedule regarding multiple objectives. Therefore, in this research, we make use of one of the multiple objective decision-making methods, a global criterion approach, to develop a multi-objective model for solving FMS scheduling problems with consideration of three per...

متن کامل

Flow shop Scheduling Problem with Maintenance Coordination: a New Approach

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

متن کامل

A meta-heuristic approach to solve a JIT scheduling problem in hybrid flow shop

In this paper we address a hybrid flow shop scheduling problem considering the minimization of the sum of the total earliness and tardiness penalties. This problem is proven to be NP-hard, and consequently the development of heuristic and meta-heuristic approaches to solve it is well justified. So, we propose an ant colony optimization method to deal with this problem. Our proposed method has s...

متن کامل

Batch Scheduling in Flexible Flow Shop

In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...

متن کامل

Batch Scheduling in Flexible Flow Shop

In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C

سال: 1998

ISSN: 0387-5024,1884-8354

DOI: 10.1299/kikaic.64.4519