Multimode resource-constrained project scheduling in flexible projects
نویسندگان
چکیده
منابع مشابه
Scheduling resource-constrained projects with a flexible project structure
In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally implemented activities. However, established model formulations and solution approaches for the resourc...
متن کاملA Preemptive multimode resource constrained project scheduling model with cash flows
Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...
متن کاملQuality- and profit-oriented scheduling of flexible resource-constrained projects
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with respect to the implementation of the optional activities. Such decisions affect the duration, cost, qual...
متن کاملThe Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Global Optimization
سال: 2019
ISSN: 0925-5001,1573-2916
DOI: 10.1007/s10898-019-00832-8