Multimodal processes prototyping subject to fuzzy operation time constraints

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

MULTI-OBJECTIVE OPTIMIZATION WITH PREEMPTIVE PRIORITY SUBJECT TO FUZZY RELATION EQUATION CONSTRAINTS

This paper studies a new multi-objective fuzzy optimization prob- lem. The objective function of this study has dierent levels. Therefore, a suitable optimized solution for this problem would be an optimized solution with preemptive priority. Since, the feasible domain is non-convex; the tra- ditional methods cannot be applied. We study this problem and determine some special structures related...

متن کامل

OPTIMIZATION OF LINEAR OBJECTIVE FUNCTION SUBJECT TO FUZZY RELATION INEQUALITIES CONSTRAINTS WITH MAX-AVERAGE COMPOSITION

In this paper, the finitely many constraints of a fuzzy relationinequalities problem are studied and the linear objective function on the regiondefined by a fuzzy max-average operator is optimized. A new simplificationtechnique which accelerates the resolution of the problem by removing thecomponents having no effect on the solution process is given together with analgorithm and a numerical exa...

متن کامل

Optimization of linear objective function subject to Fuzzy relation inequalities constraints with max-product composition

In this paper, we study the finitely many constraints of the fuzzyrelation inequality problem and optimize the linear objectivefunction on the region defined by the fuzzy max-product operator.Simplification operations have been given to accelerate theresolution of the problem by removing the components having noeffect on the solution process. Also, an algorithm and somenumerical and applied exa...

متن کامل

Distributed Infrastructure Inspection Path Planning subject to Time Constraints

Within this paper, the problem of 3D structural inspection path planning for distributed infrastructure using aerial robots that are subject to time constraints is addressed. The proposed algorithm handles varying spatial properties of the infrastructure facilities, accounts for their different importance and exploration function and computes an overall inspection path of high inspection reward...

متن کامل

optimization of linear objective function subject to fuzzy relation inequalities constraints with max-average composition

in this paper, the finitely many constraints of a fuzzy relationinequalities problem are studied and the linear objective function on the regiondefined by a fuzzy max-average operator is optimized. a new simplificationtechnique which accelerates the resolution of the problem by removing thecomponents having no effect on the solution process is given together with analgorithm and a numerical exa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2015

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2015.06.399