Multilevel Production Systems with Dependent Demand with Uncertainty of Lead Times
نویسندگان
چکیده
منابع مشابه
An EPQ Model with Increasing Demand and Demand Dependent Production Rate under Trade Credit Financing
This paper investigates an EPQ model with the increasing demand and demand dependent production rate involving the trade credit financing policy, which is seldom reported in the literatures. The model considers the manufacturer was offered by the supplier a delayed payment time. It is assumed that the demand is a linear increasing function of the time and the production rate is proportional to ...
متن کاملAn integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production
In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...
متن کاملCapacity Expansion with Lead Times and Correlated Random Demand
The combination of uncertain demand and lead times for installing capacity creates the risk of shortage during the lead time, which may have serious consequences for a service provider with dependent customers. This paper analyzes a model of capacity expansion with correlated random demand and a fixed lead time for adding capacity. We develop and prove the form of an optimal policy for expansio...
متن کاملCapacity Expansion with Lead Times and Autocorrelated Random Demand
The combination of uncertain demand and lead times for installing capacity creates the risk of shortage during the lead time, which may have serious consequences for a service provider with dependent customers. This paper analyzes a model of capacity expansion with autocorrelated random demand and a fixed lead time for adding capacity. To provide a specified level of service, a discrete time ex...
متن کاملCapacity Expansion for Random Exponential Demand Growth with Lead Times
The combination of demand uncertainty and a lead time for adding capacity creates the risk of capacity shortage during the lead time. We formulate a model of capacity expansion for uncertain exponential demand growth and deterministic expansion lead times when there is an obligation to provide a specified level of service. The service level, defined in terms of the ratio of expected lead time s...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2016
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2016/4967341