Multi-timescale coordinated operation of a CHP plant-wind farm portfolio considering multiple uncertainties
نویسندگان
چکیده
This paper proposes a multi-timescale coordinated operation approach which coordinates the combined heat and power (CHP) plant wind farm in deregulated day-ahead market real-time balancing electricity market. aims to optimize profits of CHP-wind portfolio by considering energy sale penalty two-price Multiple uncertainties load, generation, price, up- down-regulation prices are taken into account for optimal operation. A stochastic optimization method is applied solve proposed problem. The simulated on real-life system Copenhagen Denmark where an company owns both CHP farm. simulation results verify that can achieve profitable markets highly robust against multiple uncertainties.
منابع مشابه
Scenario-based stochastic optimal operation of wind/PV/FC/CHP/boiler/tidal/energy storage system considering DR programs and uncertainties
Background: Micro-grid (MG) can be described as a group of controllable loads and distributed energy resources that can be connected and disconnected from the main grid and utilized in grid-connected or islanded modes considering certain electrical constraints. Methods: The objective of this article are as follows: (1) predict the uncertainties through the hybrid method of WT-ANN-ICA and (2) de...
متن کاملOptimal Coordinated Voltage Control in Distribution Networks in presence of Solar and Wind Power Plants Considering Uncertainties
Abstract: In the last decade, the amount of distributed generation connected to the distribution network is increasing. The presence of distributed generation resources in distribution systems has a great influence on its behavior and it is necessary to consider the impact of these resources on the distribution network design. In this study, Optimal Coordinated Voltage Control (OCVC) using wind...
متن کاملAssessing the Validity of Wind Farm Noise Monitoring Data for Periods of Partial Wind Farm Operation
Wind farm noise compliance assessments require measurement of the wind farm noise under full operating conditions. Normal wind farm operation typically includes periods where one or more wind turbines may be unable to operate, due to maintenance requirements, grid restrictions, or other factors. For a large wind farm with many wind turbines, or in situations where cumulative noise impacts from ...
متن کاملOperation of multi Carrier microgrid (MCMG) considering demand response
: In this paper, the operation of a future distribution network is discussed under the assumption of a multi-carrier microgrid (MCMG) concept. The new model considers a modern energy management technique in electricity and natural gas networks based on a novel demand side management (DSM) which the energy tariff for responsive loads are correlated to the energy input of the network and changes ...
متن کاملWind farm portfolio optimization under network capacity constraints
In this article, we provide a new methodology for optimizing a portfolio of wind farms within a market environment, for two Market Designs (exogenous prices and endogenous prices). Our model is built on an agent based representation of suppliers and generators interacting in a certain number of geographic demand markets, organized as two tiered systems. Assuming rational expectation of the agen...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Electrical Power & Energy Systems
سال: 2021
ISSN: ['1879-3517', '0142-0615']
DOI: https://doi.org/10.1016/j.ijepes.2020.106428