Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost
نویسندگان
چکیده
As container ports become increasingly important to the global supply chain, a growing number of are improving their competencies by consolidating multiple terminal resources internally. In addition, in context energy conservation and emission reduction, measure competitiveness not only terms size, throughput service level, but also low consumption pollution. Therefore, nonlinear mixed-integer programming model considering cost carbon is developed for multi-terminal berth quay crane joint robust scheduling problem under uncertain environments minimize sum expectation variance total all randomly generated samples. The considers water depth interference cranes, etc. expected vessel arrival time average operational efficiency plus relaxation used as actual values when scheduling. Finally, an improved adaptive genetic algorithm combining simulated annealing mechanism, numerical experiments designed. results show that with uncertainties coordination mechanism can effectively reduce operating cost, including costs departure delay rate, improve resource utilization. Meanwhile, obtain more significant improvement effects than uncertainties.
منابع مشابه
Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...
متن کاملIntegrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
Container terminals mainly include three types of handling equipment, i.e., quay cranes (QCs), internal trucks (ITs) and yard cranes (YCs). Due to high cost of the handling equipment, container terminals can hardly purchase additional handling equipment. Therefore, the reasonable scheduling of these handling equipment, especially coordinated scheduling of the three types of handling equipment, ...
متن کاملOptimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
We focus on the integrated seaside operations in container terminals, namely the integration of berth allocation, quay crane assignment and quay crane scheduling problems. We first develope a mixed-integer linear programming formulation. Then, we propose an efficient cutting plane algorithm based on a decomposition scheme. Our approach deals with berthing positions of the vessels and their assi...
متن کاملRobust Scheduling for Berth Allocation and Quay Crane Assignment Problem
Decision makers must face the dynamism and uncertainty of real-world environments when they need to solve the scheduling problems. Different incidences or breakdowns, for example, initial data could change or some resources could become unavailable, may eventually cause the infeasibility of the obtained schedule. To overcome this issue, a robust model and a proactive approach are presented for ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2023
ISSN: ['2071-1050']
DOI: https://doi.org/10.3390/su15065018