Multi-site scheduling with fuzzy concepts

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-site scheduling with fuzzy concepts

The objective of multi-site scheduling is to support the scheduling activities of a global scheduler and schedulers in distributed production plants in a cooperative way. A global schedule generated on a global level must be translated into detailed schedules as part of the local scheduling process. In case of disturbance, feedback between the local and global levels is essential. Global level ...

متن کامل

A Multi-Site Scheduling System

The objective of multi-site scheduling is to support the scheduling activities of a global scheduler and schedulers in distributed production plants in a cooperative way. A global schedule generated on a global level must be translated into detailed schedules as part of the local scheduling process. In case of disturbance, feedback between the local and global levels is essential. Previous meth...

متن کامل

Knowledge-based Multi-site Coordination and Scheduling 1. the Multi-site Scheduling Problem

In recent years, an increasing interest in the use of artificial intelligence techniques in the area of industrial production planning and scheduling could be observed. Most of the developed systems addressed the problem of scheduling the production activities of a single plant. However, within many industrial enterprises the production processes are distributed over several manufacturing sites...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Approximate Reasoning

سال: 1998

ISSN: 0888-613X

DOI: 10.1016/s0888-613x(98)10005-1