MULTI-PERIOD OPTIMAL FACILITY LOCATION MODEL FOR RENOVATION AND ABOLITION PLANNING

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Combining data envelopment analysis and multi-objective model for the efficient facility location–allocation decision

This paper proposes an innovative procedure of finding efficient facility location–allocation (FLA) schemes, integrating data envelopment analysis (DEA) and a multi-objective programming (MOP) model methodology. FLA decisions provide a basic foundation for designing efficient supply chain network in many practical applications. The procedure proposed in this paper would be applied to the FLA pr...

متن کامل

Facility Location and Inventory Balancing in a Multi-period Multi-echelon Multi-objective Supply Chain: An MOEA Approach

A comprehensive and integrated study of any supply chain (SC) environment is a vital requirement that can create various advantages for the SC owners. This consideration causes productive managing of the SC through its whole wide components from upstream suppliers to downstream retailers and customers.  On this issue, despite many valuable studies reported in the current literature, considerabl...

متن کامل

Equitable multi objective model for public facility location using RLTP technique

In the present research, a multi-objective model is proposed, which considers equity among the citizens in addition to the cost criterion. Then, the model will be solved using Reservation Level Tchebycheff Procedure (RLTP), which is one of the interactive multi-objective decision-making techniques. Subsequently, the obtained results will be compared with those of the single-objective models to ...

متن کامل

A Multi Objective Geometric Programming Model for Optimal Production and Marketing Planning

This paper presents a multi objective geometric programming model which determines the product`s selling price in two markets. We assume demand is a function of price and marketing expenditure in two markets. The cost of production is also assumed to be a function of demands in both markets. Our model is a posynomial function which is solved using Geometric Programming (GP). In our GP implement...

متن کامل

Multi-period capacitated facility location under delayed demand satisfaction

We address an extension of the classical multi-period facility location problem in which customers are sensitive to delivery lead times. Accordingly, two customer segments are considered. The first segment comprises customers that require timely demand satisfaction, whereas customers accepting delayed deliveries make up the second segment. Each customer belonging to the latter segment specifies...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Japan Society of Civil Engineers, Ser. D3 (Infrastructure Planning and Management)

سال: 2014

ISSN: 2185-6540

DOI: 10.2208/jscejipm.70.i_211