Multi-Objective Lead-Time Control Problem with Stochastic Constraints
نویسندگان
چکیده
منابع مشابه
A Multi-Objective Mixed-Model Assembly Line Sequencing Problem With Stochastic Operation Time
In today’s competitive market, those producers who can quickly adapt themselves todiverse demands of customers are successful. Therefore, in order to satisfy these demands of market, Mixed-model assembly line (MMAL) has an increasing growth in industry. A mixed-model assembly line (MMAL) is a type of production line in which varieties of products with common base characteristics are assembled o...
متن کاملA multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
In this paper, we develop a multi-objective model to optimally control the lead time of a multi-stage assembly system, using genetic algorithms. The multi-stage assembly system is modelled as an open queueing network. It is assumed that the product order arrives according to a Poisson process. In each service station, there is either one or infinite number of servers (machines) with exponential...
متن کاملMulti-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)
In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...
متن کاملA multiple objective approach for joint ordering and pricing planning problem with stochastic lead times
The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...
متن کاملA multi-objective lead time control problem in multistage assembly systems using an interactive method
In this paper, we develop a multi-objective model to optimally control the lead time of a multistage assembly system, using an interactive method. The multistage assembly system is modelled as an open queueing network, whose service stations represent manufacturing or assembly operations. It is assumed that the product order arrives according to a Poisson process. In each service station, there...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Applied Research and Technology
سال: 2014
ISSN: 1665-6423
DOI: 10.1016/s1665-6423(14)70599-1