Multi-manned Assembly Line Balancing Problem with Skilled Workers: A New Mathematical Formulation
نویسندگان
چکیده
منابع مشابه
Assembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations
This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the adv...
متن کاملA Multi-Objective Particle Swarm Optimization for Mixed-Model Assembly Line Balancing with Different Skilled Workers
This paper presents a multi-objective Particle Swarm Optimization (PSO) algorithm for worker assignment and mixed-model assembly line balancing problem when task times depend on the worker’s skill level. The objectives of this model are minimization of the number of stations (equivalent to the maximization of the weighted line efficiency), minimization of the weighted smoothness index and minim...
متن کاملA cost-oriented model for multi-manned assembly line balancing problem
In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...
متن کاملa cost-oriented model for multi-manned assembly line balancing problem
in many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. this type of assembly line is called multi-manned assembly line (mal). in the classical multi-manned assembly line balancing problem (malbp) the objective is to minimize the manpower needed to manufacture one product unit. apart from the manpower, othe...
متن کاملFuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach
Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2017
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2017.08.344