Multi-machine scheduling with deteriorating jobs and scheduled maintenance
نویسندگان
چکیده
منابع مشابه
Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملDue-date assignment and parallel-machine scheduling with deteriorating jobs
In this paper we study the problem of scheduling n deteriorating jobs on m identical parallel machines. Each job’s processing time is a nondecreasing function of its start time. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of the due-date, earliness and tardiness penalties. We show that this problem is NP-hard, and we present a heuris...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs and a mathematical model based on binary integer programming (BIP) is developed. Since the precedence constraints exist, a job cannot start before completion of its all predecessors. The proposed model consists of two steps: in the first step, the earliest starting time of each job is c...
متن کاملScheduling Resumable Deteriorating Jobs
We consider the following single-machine time-dependent scheduling problem with constraints on the machine availability. There is given a set of independent and deteriorating jobs Jj , 1 ≤ j ≤ n, to be processed on a single machine, starting from time t0 > 0. The processing time pj of job Jj is a proportional function of the starting time Sj of this job, pj = αjSj, where Sj ≥ t0 and deteriorati...
متن کاملSingle machine slack due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
In this paper, we consider the slack due-window assignment model and study a single machine scheduling problem of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. The cost for each job consists of four components: earliness, tardiness, window location and window size. The objective is to schedule the jobs and to assign the maintenance activity and due-windows s...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 2008
ISSN: 0307-904X
DOI: 10.1016/j.apm.2006.12.008