Multi-Item, Multi-Period Production Planning with Uncertain Demand
نویسندگان
چکیده
منابع مشابه
Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...
متن کاملMulti-period liner ship fleet planning with dependent uncertain container shipment demand
This paper deals with a realistic multi-period liner ship fleet planning problem by incorporating stochastic dependency of the random and period-dependent container shipment demand. This problem is formulated as a multi-period stochastic programming model with a sequence of interrelated two-stage stochastic programming (2SSP) problems characterized ship fleet planning in each single period. A s...
متن کاملMulti-period design and planning of closed-loop supply chains with uncertain supply and demand
A design and planning approach is proposed for addressing general multi-period, multi-product closedloop supply chains (CLSCs), structured as a 10-layer network (5 forward plus 5 reverse flows), with uncertain levels in the amount of raw material supplies and customer demands. The consideration of a multi-period setting leads to a multi-stage stochastic programming problem, which is handled by ...
متن کاملMulti-period, Multi-product, Aggregate Production Planning under demand uncertainty by considering Wastage Cost and Incentives
Aggregate production planning (APP) involves the simultaneous determination of company’s production, inventory and employment levels which fall between the broad decisions of long range planning and detailed short range planning. A mathematical model is formulated to investigate the optimal decision on each planning period. The goal is to minimize the total relevant costs considering time varyi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IIE Transactions
سال: 1996
ISSN: 0740-817X,1545-8830
DOI: 10.1080/15458830.1996.11770742