Multi-Hop Relaying: An End-to-End Delay Analysis
نویسندگان
چکیده
منابع مشابه
End-to-End Delay Analysis for IEEE 802.11 String-Topology Multi-Hop Networks
String-topology multi-hop network is often selected as an analysis object because it is one of the fundamental network topologies. The purpose of this paper is to establish expression for end-to-end delay for IEEE 802.11 string-topology multi-hop networks. For obtaining the analytical expression, the effects of frame collisions and carrier-sensing effect from other nodes under the non-saturated...
متن کاملProviding End-to-End Delay Guarantees for Multi-hop Wireless Sensor Networks over Unreliable Channels
Wireless sensor networks have been increasingly used for real-time surveillance over large areas. In such applications, it is important to support end-toend delay constraints for packet deliveries even when the corresponding flows require multi-hop transmissions. In addition to delay constraints, each flow of real-time surveillance may require some guarantees on throughput of packets that meet ...
متن کاملStochastic Network Calculus for End-to-end Delay Evaluation of Avionics Multi-hop Virtual Links
The VL (Virtual Link) concept used by AFDX network of modern aircraft such as A380 represents a big assumption for input flows characteristics. But mapping of many VL on a multi switch Ethernet architecture lead to potential congestion on a port of a (given) switch. Thus, there is strong need to prove that no frame will be lost by the network (no switch queue will overflow) and to evaluate the ...
متن کاملSleep/wake scheduling scheme for minimizing end-to-end delay in multi-hop wireless sensor networks
We present a sleep/wake schedule protocol for minimizing end-to-end delay for event driven multi-hop wireless sensor networks. In contrast to generic sleep/wake scheduling schemes, our proposed algorithm performs scheduling that is dependent on traffic loads. Nodes adapt their sleep/wake schedule based on traffic loads in response to three important factors, (a) the distance of the node from th...
متن کاملPerformance Analysis of MAC Protocols for Location-Independent End-to-end Delay in Multi-hop Wireless Mesh Networks
Backbone wireless mesh networks (WMNs) are emerging alternatives to conventional wired backbones for metropolitan and have attracted much attention from both academic and industrial world as an infrastructure network for realizing the ubiquitous computing environment. WMN is a generalization of Wireless Ad-Hoc Networks that considers the use of heterogeneous nodes (e.g., clients and routers) an...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Wireless Communications
سال: 2016
ISSN: 1536-1276
DOI: 10.1109/twc.2015.2504528