MULTI-AGV SCHEDULING OPTIMIZATION BASED ON NEURO-ENDOCRINE COORDINATION MECHANISM

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-agv Scheduling Optimization Based on Neuro-endocrine Coordination Mechanism

To solve the problems of task scheduling and coordination control presented by a multi-AGV system, the mixed regional control model for the production task has been advanced. The architecture of multi-AGV task assignment and scheduling mechanism has been proposed by combining the mixed regional control model for the production task and the neuro-endocrine coordination mechanism. Hormones for ma...

متن کامل

designing unmanned aerial vehicle based on neuro-fuzzy systems

در این پایان نامه، کنترل نرو-فازی در پرنده هدایت پذیر از دور (پهپاد) استفاده شده است ابتدا در روش پیشنهادی اول، کنترل کننده نرو-فازی توسط مجموعه اطلاعات یک کنترل کننده pid به صورت off-line آموزش دیده است و در روش دوم یک کنترل کننده نرو-فازی on-line مبتنی بر شناسایی سیستم توسط شبکه عصبی rbf پیشنهاد شده است. سپس کاربرد این کنترل کننده در پهپاد بررسی شده است و مقایسه ای ما بین کنترل کننده های معمو...

Knowledge-based Multi-site Coordination and Scheduling 1. the Multi-site Scheduling Problem

In recent years, an increasing interest in the use of artificial intelligence techniques in the area of industrial production planning and scheduling could be observed. Most of the developed systems addressed the problem of scheduling the production activities of a single plant. However, within many industrial enterprises the production processes are distributed over several manufacturing sites...

متن کامل

Optimization of an energy based bi-objective multi skilled resource investment project scheduling problem

Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...

متن کامل

Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization

Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal on Smart Sensing and Intelligent Systems

سال: 2014

ISSN: 1178-5608

DOI: 10.21307/ijssis-2017-723