Modelling Building Renovation Using PERT

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

OPTIMALIZATION PHASE USING GRAPH MODELLING FOR RELIABLE BUILDING COMPLEXES

During the planning phase of modern, complex, block-structured, large-area located, but still landscape-harmonized health-care buildings, the key is the optimal positioning of the blocks and functions, simultaneously ensuring the most-effective backup-paths for any transportation route failure in the buildings in order to speed up system operation, reduce maintenance costs and especially to imp...

متن کامل

Urban Dynamics Modelling Using Ant Nest Building

Urban dynamics deal with spatial organizations where a great complexity of interactions appears. Social and economic aspects interact and environmental objectives are nowadays a major purpose for sustainable urban development. We propose some generic modelling processes able to face with this complexity, in order to simulate the evolution of the city centers. These organizational centers need a...

متن کامل

A Multi-Scenario Zero-Energy Building Techno-Economic Case Study Analysis for a Renovation of a Residential Building

According to the previous pieces of research, the building sector consumes about 40 % of total yield energy and produce one-third of GHG pollution emission. This point shows the significant potential in two aspects of energy optimization and pollution reduction in this field. The purpose of this research as a case study is to construct a residential building and develop the paths for reaching a...

متن کامل

Solving Fuzzy PERT Using Gradual Real Numbers

From a set of a partially ordered tasks, one goal of the project scheduling problem is to compute earliest starting dates, latest starting dates and floats of the different tasks, and to identify critical tasks. When durations of tasks are not precisely known, the problem is much trickier. Recently we provided polynomial algorithms to compute upper bound of activity floats in the interval-value...

متن کامل

Semi-automatic Modelling of Building Façades with Shape Grammars Using Historic Building Information Modelling

This paper outlines a new approach for generating digital heritage models from laser scan or photogrammetric data using Historic Building Information Modelling (HBIM). HBIM is a plug-in for Building Information Modelling (BIM) software that uses parametric library objects and procedural modelling techniques to automate the modelling stage. The HBIM process involves a reverse engineering solutio...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Asian Research Journal of Mathematics

سال: 2020

ISSN: 2456-477X

DOI: 10.9734/arjom/2020/v16i430184