Modeling Supply Chains by Critical Paths and Leontief Input-Output Table

نویسندگان

چکیده

We formulate a supply-chain problem by:(1)casting it in the model of critical-path analysis as defined by predecessor/successor relations, and (2)allowing for mutual dependency among activity nodes applying Leontief’s input-output structure.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Is the Leontief input-output model a production-prices model?

The Leontief model is generally considered as belonging to the category of the production-prices models , aside of the Ricardian, Marxian and Sra aian models. This paper clearly demonstrates that this is a super cial point of view. As the Leontief model handles price indexes, it is over two periods: the Leontief price indexes solve the model for the base time period. The production-prices model...

متن کامل

Agent-Based Modeling of Supply Chains in Critical Situations

Supply chains are discussed in this article. They are viewed as intelligent decentralized systems that meet the agent paradigm. Thus possibility of arising critical situations in the chains can be analyzed in the agent-based manner. The work is focused on applying an overall methodology dedicated to the discovery of crises and support of anti-crisis activities. The agent-based model is proposed...

متن کامل

Modeling floating supply chains

Manufacturers are establishing smaller supplier network for enhanced cooperation, developmental efficiency and specialization. However, it limits manufacturing flexibility manifested by supplier capacity, disruptive events and customer attitudes. Methodology for modeling flexible assembler-suppliers relationships to manage supply chains in emerging markets is described. Supplier database, decis...

متن کامل

Reasoning About Input - Output Modeling

Dynami al Systems Matthew Easley and Elizabeth Bradley? University of Colorado Department of Computer S ien e Boulder, CO 80309-0430 feasley,lizbg s. olorado.edu Symposium on Intelligent Data Analysis (IDA-99), August 1999, Amsterdam Springer, Le ture Notes in Computer S ien e 1642 Abstra t. The goal of input-output modeling is to apply a test input to a system, analyze the results, and learn s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Global Journal of Science Frontier Research

سال: 2022

ISSN: ['0975-5896', '2249-4626']

DOI: https://doi.org/10.34257/gjsfrfvol22is1pg1