Modeling Causes of Cost Overrun in Large Construction Projects with Partial Least Square-SEM Approach: Contractor's Perspective

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Frequency of time overrun causes in road construction in Palestine : Contractors

Time, cost and quality have their proven importance as the prime measures for project success. However, the history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. This study is conducted to investigate the occurrence frequency of time overrun causes in road construction projects in the West Bank in Palestine from contracto...

متن کامل

SEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants

This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire ...

متن کامل

Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks

Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...

متن کامل

Partial Least Square-based Model Predictive Control for Large-scale Manufacturing Process with Disturbances Partial Least Square-based Model Predictive Control for Large-scale Manufacturing Process with Disturbances

The Model Predictive Control (MPC) method has been widely accepted as a useful tool for keeping the quality on target in the manufacturing process. However, the conventional MPC methods are inadequate for the large-scale manufacturing process particularly in the presence of disturbances. The goal of the paper is to suggest a Partial Least Square (PLS)based MPC methodology for accommodating the ...

متن کامل

Modeling User Acceptance of Internet Banking in Malaysia: a Partial Least Square (pls) Approach

This study is the first empirical research that compares three well known technology adoption models in the in the field of e-banking. It aims to determine the dominant factor(s) which influence the user intention to use Internet banking. Three models (TAM, TPB and TRA) were used to test the impact of five factors (perceived ease of use, perceived usefulness, attitude, subjective norms and perc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Research Journal of Applied Sciences, Engineering and Technology `

سال: 2013

ISSN: 2040-7459,2040-7467

DOI: 10.19026/rjaset.5.4736