Modeling Artificial Ground Freezing for Construction of Two Tunnels of a Metro Station in Napoli (Italy)

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization

Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...

متن کامل

application and construction of carbon paste modified electrodes developed for determination of metal ions in some real samples

ساخت الکترودهاِی اصلاح شده ِیکِی از چالشهاِی همِیشگِی در دانش شیمِی بوِیژه شیمِی تجزیه مِی باشد ،که با در نظر گرفتن سادگِی ساخت، کاربردی بودن و ارزان بودن روش مِی توان به باارزش بودن چنِین سنسورهاِی پِی برد.آنچه که در ادامه آورده شده به ساخت و کاربرد الکترودهاِی اصلاح شده با استفاده از نانو ذرات در اندازه گِیرِی ولتامترِی آهن وکادمِیم اشاره دارد. کار اول اختصاص دارد به ساخت الکترود خمِیر کربن اصلاح شده با لِیگاند داِ...

15 صفحه اول

a synchronic and diachronic approach to the change route of address terms in the two recent centuries of persian language

terms of address as an important linguistics items provide valuable information about the interlocutors, their relationship and their circumstances. this study was done to investigate the change route of persian address terms in the two recent centuries including three historical periods of qajar, pahlavi and after the islamic revolution. data were extracted from a corpus consisting 24 novels w...

15 صفحه اول

Simulation of Metro Train Fire in an Underground Station of Tehran Metro Line 7

In this research a fire scenario was simulated in one of the stations of the line 7 of Tehran's subway system. The Line 7 is under construction and the ventilation system is under design. Fire was set for a stopping metro train at the platform of the station. A 160 meter length eight-car metro train with the forth wagon on the fire was studied. The heat release rate is based on a quadratic f...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energies

سال: 2020

ISSN: 1996-1073

DOI: 10.3390/en13051272