Modeling and experimental research of quay crane cargo lowering processes

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals

In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...

متن کامل

Skew control of a quay container crane

In this paper, the skew control of the load (container) in the quay crane used in the dockside of a container terminal is investigated. The mathematical model of the 3-dimensional (3D) motions of the load is first derived. The container hooked to a spreader is suspended by four ropes in air. When the container is accelerated by the trolley or is disturbed by winds, it will make a rotational mot...

متن کامل

An evolutionary approach to solving a new integrated quay crane assignment and quay crane scheduling mathematical model

This paper puts forward an integrated optimisation model that combines two distinct problems arising in container terminals, namely the Quay Crane Assignment Problem, and the Quay Crane Scheduling Problem. The model is of the mixed-integer programming type with the objective being to minimise the tardiness of vessels. Although exact solutions can be found to the problem using Branch-and-Cut, fo...

متن کامل

Modeling and solution of the joint quay crane and truck scheduling problem

This paper addresses the joint quay crane and truck scheduling problem at a container terminal, considering the coordination of the two types of equipment to reduce their idle time between performing two successive tasks. For the unidirectional flow problem with only inbound containers, in which trucks go back to quayside without carrying outbound containers, a mixed-integer linear programming ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advances in Mechanical Engineering

سال: 2019

ISSN: 1687-8140,1687-8140

DOI: 10.1177/1687814019896927