MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs

We address a multi-item capacitated lot-sizing problem with setup times that arises in real-world production planning contexts. Demand cannot be backlogged, but can be totally or partially lost. Safety stock is an objective to reach rather than an industrial constraint to respect. The problem is NP-hard. We propose mixed integer programming heuristics based on a planning horizon decomposition s...

متن کامل

The multi-item capacitated lot-sizing problem with setup times and shortage costs

We address a multi-item capacitated lot-sizing problem with setup times and shortage costs that arises in real-world production planning problems. Demand cannot be backlogged, but can be totally or partially lost. The problem is NP-hard. A mixed integer mathematical formulation is presented. Our approach in this paper is to propose some classes of valid inequalities based on a generalization of...

متن کامل

Multi-Item capacitated lot-Sizing problem with setup times and shortage costs : Polyhedral results

We address a multi-item capacitated lot-sizing problem with setup times and shortage costs that arises in real-world production planning problems. Demand cannot be backlogged, but can be totally or partially lost. The problem can be modelled as a mixed integer program and it is NP-hard. In this paper, we propose some classes of valid inequalities based on a generalization of Miller et al. [17] ...

متن کامل

An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times

This paper considers the capacitated multi-level lot-sizing problem with setup times, a class of difficult problems often faced in practical production planning settings. In the literature, relax-and-fix is a technique commonly applied to solve this problem due to the fact that setup decisions in later periods of the planning horizon are sensitive to setup decisions in the early periods but not...

متن کامل

The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs

We address a multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages. Demand cannot be backlogged, but can be totally or partially lost. Safety stock is an objective to reach rather than an industrial constraint to respect. The problem is np-hard. We propose a Lagrangian relaxation of the resource capacity constraints. We develop a dynamic programming algor...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: RAIRO - Operations Research

سال: 2007

ISSN: 0399-0559,1290-3868

DOI: 10.1051/ro:2007014