Minimum Expected Cost based Design of Vertical Drain Systems
نویسندگان
چکیده
منابع مشابه
Design and Performance Evaluation of Cost Function Based Vertical Handoff
The main objectives of a handoff procedure are, first, to minimize the number of link transfers and second, to minimize the handoff processing delay by correct choice of target BS/AP with speedy execution. This minimizes the probability of connection interruptions and reduces the switching load. If the handoff is not fast enough, the quality of the service experiences degradations. A handoff sh...
متن کاملDesign of Minimum Sensitivity Systems
David L. Kleinman was born in New York, X. Y., on January 4, 1912. He received the B.E.E. degree from the Cooper Union for the Xdvancement of Science and Xrt, New York, N. Y . , in 1962, and the S.W. degree in 1963 and the Ph.D. degree in 1967, both in electrical engineering, from the Llassachusetts Institute of Technolop, Cambridge, Mass. The former degree was obtained under a Sloan ...
متن کاملA Novel Experimental Analysis of the Minimum Cost Flow Problem
In the GA approach the parameters that influence its performance include population size, crossover rate and mutation rate. Genetic algorithms are suitable for traversing large search spaces since they can do this relatively fast and because the mutation operator diverts the method away from local optima, which will tend to become more common as the search space increases in size. GA’s are base...
متن کاملFinding the Minimum Distance from the National Electricity Grid for the Cost-Effective Use of Diesel Generator-Based Hybrid Renewable Systems in Iran
The electricity economy and its excessive consumption have become one of the main concerns of the Iranian government for many years. This issue, along with recent droughts, shows the need to use renewable energy that is free and clean and does not require water. In addition, due to the high cost of cable-laying and maintenance of power lines, it is not at all an option at all distances over the...
متن کاملCRITICAL INCIDENT ANGLE FOR THE MINIMUM COST DESIGN OF LOW, MID AND HIGH-RISE STEEL AND REINFORCED CONCRETE-COMPOSITE BUILDINGS
One of the main tasks of engineers is to design structural systems light and economic as possible, yet resistant enough to withstand all possible loads arising during their service life and to absorb the induced seismic energy in a controlled and predictable fashion. The traditional trial-and-error design approach is not capable to determine an economical design satisfying also the code require...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of The Korean Society of Agricultural Engineers
سال: 2007
ISSN: 1738-3692
DOI: 10.5389/ksae.2007.49.6.093