Minimum deviation algorithm for two-stageno-wait flowshops with parallel machines
نویسندگان
چکیده
منابع مشابه
Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملNo-Wait Flowshops to Minimize Total Tardiness with Setup Times
The m-machine no-wait flowshop scheduling problem is addressed where setup times are treated as separate from processing times. The objective is to minimize total tardiness. Different dispatching rules have been investigated and three were found to be superior. Two heuristics, a simulated annealing (SA) and a genetic algorithm (GA), have been proposed by using the best performing dispatching ru...
متن کاملNo-wait flowshops with bicriteria of makespan and maximum lateness
In this work we study a flowshop scheduling problem in which jobs are not allowed to wait in-between machines, a situation commonly referred to as no-wait. The concerned criterion is to minimize a weighted sum of makespan and maximum lateness. A dominance relation for the case of three-machine is presented and evaluated by experimental designs. Several heuristics and local search methods are pr...
متن کاملLotstreaming with Equal Sublots in No-wait Flowshops
We consider the problem of minimizing makespan in a no-wait flow-shop with an arbitrary number of machines. We assume that all sublots have the same number of items. We consider the cases with or without loading times. In both cases we show the existence of a critical machine which never remains idle. Then we get a set of general conditions on the processing times and loading times, which bind ...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Mathematics with Applications
سال: 2004
ISSN: 0898-1221
DOI: 10.1016/j.camwa.2003.08.003