Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs
نویسندگان
چکیده
منابع مشابه
Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs
In this paper we look at the problem where we have to schedule n jobs with release dates, due dates, weights, and equal processing times on a single machine. The objective is to minimize the sum of weighted tardiness (1|rj , pj = p| ∑ wjTj in the threefield notation scheme). We formulate the problem as a time indexed ILP after which we solve the LP-relaxation. We show that for certain special c...
متن کاملSingle .machine Total Weighted Tardiness with Release Dates Single Machine Total Weighted Tardiness with Release Dates
The single machine total weighted tardiness with release dates problem is known to be strongly NP-hard. With a new lower bounding scheme and a new upper bounding scheme, we get an efficient branch and bound algorithm. In the paper, we first introduce the history of the problem and its computational complexity. Second, the lower bounding schemes and the upper bounding schemes are described in de...
متن کاملMinimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...
متن کاملMinimizing Total Tardiness in Parallel-Machine Scheduling with Release Dates
The considered problem is the scheduling of a set of N jobs on M identical parallel machines in order to minimize the total tardiness without any preemption or splitting. Each job has its own processing time, release date and due date. All the machines are considered identical (with same speed) and available during all the scheduling period. This problem is NP-hard. An exact resolution, an Ant ...
متن کاملMinimizing the Sum of Makespan and Maximum Tardiness on Single Machine with Release Dates
This paper considers the bicriteria scheduling problem of simultaneously minimizing makespan (Cmax) and maximum tardiness (Tmax) on a single machine with release dates. The problem is, by nature, NP-Hard. Therefore, one approximation algorithm (labeled as CTA1) was proposed for solving this problem. The CTA1 algorithm was compared with the Branch and Bounds (BB) procedure specifically implement...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Scheduling
سال: 2010
ISSN: 1094-6136,1099-1425
DOI: 10.1007/s10951-010-0181-1