Minimizing Total Weighted Completion Time on Single Machine with Past-Sequence-Dependent Setup Times and Exponential Time-Dependent and Position-Dependent Learning Effects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing Total Weighted Completion Time on Single Machine with Past-Sequence-Dependent Setup Times and Exponential Time-Dependent and Position-Dependent Learning Effects

This paper addresses a single-machine problem in which the past-sequence-dependent p-s-d setup times and exponential time-dependent and position-dependent learning effects are considered. By the exponential time-dependent learning effect, it means that the processing time of a job is defined by an exponent function of the total actual processing time of the already processed jobs. The setup tim...

متن کامل

An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time

This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

an iterated greedy algorithm for flexible flow lines with sequence dependent setup times to minimize total weighted completion time

this paper explores the flexile flow lines where setup times are sequence- dependent. the optimization criterion is the minimization of total weighted completion time. we propose an iterated greedy algorithm (iga) to tackle the problem. an experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of iga are compared against those of some other exist...

متن کامل

Minimizing sum of completion times on a single machine with sequence-dependent family setup times

This paper presents a branch-and-bound (B&B) algorithm for minimizing the sum of completion times in a singlemachine scheduling setting with sequence-dependent family setup times. The main feature of the B&B algorithm is a new lower bounding scheme that is based on a network formulation of the problem. With extensive computational tests, we demonstrate that the B&B algorithm can solve problems ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Discrete Dynamics in Nature and Society

سال: 2009

ISSN: 1026-0226,1607-887X

DOI: 10.1155/2009/970510