Minimizing total completion time for flowshop scheduling problem with uncertain processing times

نویسندگان

چکیده

The four-machine flowshop scheduling problem is investigated with the objective of minimizing total completion time. Job processing times are uncertain where only lower and upper bounds known. This common in some manufacturing environments. Some mathematical (dominance) relations established, an algorithm (with ten scenarios) proposed. proposed converts to a single machine for which optimal solution known deterministic problem. difference among scenarios related weights assigned on machines. further improved by established evaluated based extensive computational experiments. results indicate that three perform much better than others, errors these get as size increases. statistically verified constructing confidence intervals.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times

The three-machine flowshop scheduling problem to minimize total completion time is studied where setup times are treated as separate from processing times. Setup and processing times of all jobs on all machines are unknown variables before the actual occurrence of these times. The lower and upper bounds for setup and processing times of each job on each machine is the only information that is a...

متن کامل

Flowshop scheduling problem to minimize total completion time with random and bounded processing times

The flowshop scheduling problems with n jobs processed on two or three machines, and with two jobs processed on k machines are addressed where jobs have random and bounded processing times. The probability distributions of random processing times are unknown, and only the lower and upper bounds of processing times are given before scheduling. In such cases, there may not exist a unique schedule...

متن کامل

Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times

We consider the problem of minimizing the sum of completion times in a two-machine permutation flowshop subject to setup times. We propose a new priority rule, several constructive heuristics, local search procedures, as well as an effective multiple crossover genetic algorithm. Computational experiments carried out on a large set of randomly generated instances provide evidence that a construc...

متن کامل

Robust single machine scheduling for minimizing total flow time in the presence of uncertain processing times

This research deals with the single machine scheduling problem (SMSP) with uncertain job processing times. The single machine robust scheduling problem (SMRSP) aims to obtain robust job sequences with minimum worst-case total flow time. We describe uncertain processing times using intervals, and adopt an uncertainty set that incorporates a budget parameter to control the degree of conservatism....

متن کامل

Two-machine Flowshop Scheduling Problem to Minimize Makespan or Total Completion Time with Random and Bounded Setup Times

This paper addresses the two-machine flowshop scheduling problemwith separate setup times to minimize makespan or total completion time (TCT). Setup times are relaxed to be random variables rather than deterministic as commonly used in the OR literature. Moreover, distribution-free setup times are used where only the lower and upper bounds are given. Global and local dominance relations are dev...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Rairo-operations Research

سال: 2021

ISSN: ['1290-3868', '0399-0559']

DOI: https://doi.org/10.1051/ro/2020022