Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
نویسندگان
چکیده
منابع مشابه
Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
We prove that the bicriteria single-machine scheduling problem of minimizing total completion time and maximum cost simultaneously is solvable in polynomial time. Our result settles a long-standing open problem.
متن کاملFast fully polynomial approximation schemes for minimizing completion time variance
We present fully polynomial approximation schemes for the problem of minimizing completion time variance of a set of n jobs on a single machine. The fastest of these schemes runs in time O(n/ ) and thus improves on all fully polynomial approximation schemes presented in the literature.
متن کاملSingle Machine Scheduling with Rejection: Minimizing Total Weighted Completion Time and Rejection Cost
In this paper, the authors consider a single machine scheduling problem with rejection. In traditional research, it is assumed all jobs must be processed. However, in the real-world situation, certain jobs can be rejected. In this study, the jobs can be either accepted and scheduled or be rejected at the cost of a penalty. Two objective functions are considered simultaneously: (1) minimization ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Operations Research Letters
سال: 1995
ISSN: 0167-6377
DOI: 10.1016/0167-6377(95)00023-d