Minimizing the Number of Tardy Jobs on Identical Parallel Machines Subject to Periodic Maintenance

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

Preemptive Scheduling of Independent Jobs on Identical Parallel Machines Subject to Migration Delays

We present hardness and approximation results for the problem of preemptive scheduling of n independent jobs on m identical parallel machines subject to a migration delay d with the objective to minimize the makespan. We give a sharp threshold on the value of d for which the complexity of the problem changes from polynomial time solvable to NP-hard. Next, we give initial results supporting a co...

متن کامل

Minimizing Makespan on Identical Parallel Machines

A heuristic algorithm that uses iteratively LPT and MF approaches on different job and machine sets constructed by using the current solution is developed to solve a classical multiprocessor scheduling problem with the objective of minimizing the makespan. Computational results indicate that the proposed algorithm is very competitive with respect to well-known constructive algorithms for a larg...

متن کامل

Minimizing Flowtime Subject to Optimal Makespan on Two Identical Parallel Machines

We consider the problem of scheduling jobs on two parallel identical machines where an optimal schedule is defined as one that gives the smallest total flowtime (the sum of the completion time of all jobs) among the set of schedules with optimal makespan (the completion time of the latest job). Utilizing an existing optimization algorithm for the minimization of makespan, we propose an algorith...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Manufacturing

سال: 2019

ISSN: 2351-9789

DOI: 10.1016/j.promfg.2020.01.147