Minimizing the number of tardy jobs in single machine sequencing

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

Minimizing the number of tardy jobs in single machine scheduling using MIP

This paper considers the problem of scheduling n jobs on a single machine. A fixed processing time and an execution interval are associated with each job. Preemption is not allowed. The objective is to find a feasible job sequence that minimizes the number of tardy jobs. On the basis of an original mathematical integer programming formulation, this paper shows how both good-quality lower and up...

متن کامل

New Algorithms for Minimizing the Weighted Number of Tardy Jobs On a Single Machine

In this paper we study the classical single machine scheduling problem where the objective is to minimize the weighted number of tardy jobs. Our analysis focuses on the case where one or more of three natural parameters is either constant or is taken as a parameter in the sense of parameterized complexity. These three parameters are the number of different due dates, processing times, and weigh...

متن کامل

Start Project Y43-mat Combinatorial Approximation Algorithms Minimizing the Number of Tardy Jobs on a Single Machine with Batch Setup times Minimizing the Number of Tardy Jobs on a Single Machine with Batch Setup Times

This paper investigates a single-machine sequencing problem where the jobs are divided into families, and where a setup time is incurred whenever there is a switch from a job in one family to a job in another family. This setup only depends on the family of the job next to come and hence is sequence independent. The jobs are due-dated, and the objective is to nd a sequence of jobs that minimize...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Discrete Mathematics

سال: 1993

ISSN: 0012-365X

DOI: 10.1016/0012-365x(93)90336-r