Minimization of total waiting time of jobs in n 2 specially structured Flow Shop Scheduling with set up time separated from processing time and each associated with probabilities
نویسندگان
چکیده
منابع مشابه
Heuristic Approach for Specially Structured Two Stage Flow Shop Scheduling to Minimize the Rental Cost, Processing Time, Set Up Time Are Associated with Their Probabilities Including Transportation Time and Job Weightage
The present paper is an attempt to develop a new heuristic algorithm, find the optimal sequence to minimize the utilization time of the machines and hence their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times and set up time are associated with their respective probabilities including transportation time. Further jo...
متن کاملOptimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time
One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs a...
متن کاملOn Specially Structured Two Stage Flow Shop Scheduling Problem with Setup Time Separated from Processing Time and Jobs in a String of Disjoint Job Blocks
This paper relates to two stage specially structured flow shop scheduling problem with jobs in a string of disjoint job blocks having sequence independent setup times separated from processing times each associated with their respective probabilities, where the optimization criteria is the utilization time of machines. To minimize the utilization time an algorithm is proposed and a numerical ex...
متن کاملMinimization of Utilization Time for Two Stage Specially Structured Flow Shop Scheduling problem with Setup Time, Job Weightage and Jobs in a String of Disjoint Job Blocks
In this paper we study specially structured two stage flow shop scheduling problem with jobs in a string of disjoint job blocks having sequence independent setup times separated from processing times each associated with their respective probabilities including job weightage. In flow shop scheduling optimization of elapsed time may not always result in optimization of utilization time. Here, th...
متن کاملOn Two Stage Open Shop Scheduling in Which Processing Time, Set Up Time Associated with Probabilities Including Job Block Criteria
INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY On Two Stage Open Shop Scheduling in Which Processing Time, Set Up Time Associated with Probabilities Including Job Block Criteria Deepak Gupta, Manjeet Kaur *1,2 Department of Mathematics, Maharishi Markandeshwar University, Mullana, Ambala, India [email protected] Abstract The present paper is an attempt through heu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Engineering Research and Applications
سال: 2017
ISSN: 2248-9622,2248-9622
DOI: 10.9790/9622-0706072733