Mid-range forecasting of the load duration curve
نویسندگان
چکیده
منابع مشابه
Application of SVM Methods for Mid-Term Load Forecasting*
This paper presents an approach for the medium-term load forecasting using Support Vector Machines (SVMs). The proposed SVM model was employed to predict the maximum daily load demand for the period of a month. Analyses of available data were performed and the most important features for the construction of SVM model are selected. It was shown that the size and the structure of the training set...
متن کاملA load curve based fuzzy modeling technique for short-term load forecasting
A modeling method is suggested in this paper that permits building fuzzy models for short-term load forecasting (STLF). The model building process is divided in three parts: (a) the structure identi6cation based on a fuzzy C-regression method, (b) selection of the proper model inputs which is achieved using a genetic algorithm based selection mechanism, and (c) 6ne tuning by means of a hybrid g...
متن کاملShort and Mid-Term Wind Power Plants Forecasting With ANN
In recent years, wind energy has a remarkable growth in the world, but one of the important problems of power generated from wind is its uncertainty and corresponding power. For solving this problem, some approaches have been presented. Recently, the Artificial Neural Networks (ANN) as a heuristic method has more applications for this propose. In this paper, short-term (1 hour) and mid-term (24...
متن کاملShort and Mid-Term Wind Power Plants Forecasting With ANN
In recent years, wind energy has a remarkable growth in the world, but one of the important problems of power generated from wind is its uncertainty and corresponding power. For solving this problem, some approaches have been presented. Recently, the Artificial Neural Networks (ANN) as a heuristic method has more applications for this propose. In this paper, short-term (1 hour) and mid-term (24...
متن کاملShort - Term Load Forecasting
This paper presents a novel hybrid method for short-term load forecasting. The system comprises of two artificial neural networks (ANN), assembled in a hierarchical order. The first ANN is a multilayer perceptron (MLP) which functions as integrated load predictor (ILP) for the forecasting day. The output of the ILP is then fed to another, more complex MLP, which acts as an hourly load predictor...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 1979
ISSN: 0307-904X
DOI: 10.1016/s0307-904x(79)80045-1