Metode Pelaksanaan Erection Steel Box Girder Pada Proyek Relokasi Jembatan Antelope Km 5+145 Bekasi-Jawa Barat
نویسندگان
چکیده
Metode pelaksanaan erection steel box girder pada proyek relokasi jembatan antelope km 5+145Bekasi-Jawa Barat merupakan duplikasi Jembatan Antelope yang salah satu jembatancrossing di atas Ruas Jalan Tol Jakarta-Cikampek. eksisting bersinggungan dengan rencana jalurkeret cepat Bekasi-Jawa (KCJB) sehingga perlu direlokasi. Panjang main span termasuk kedua jalanlayang pendekat adalah 300 m, sementara spannya sendiri sepanjang 44 m. Penelitian ini bertujuanuntuk merencanakan metode antelopekm 5+145 Barat. Penyusunan proyekrelokasi membutuhkan data dalam penyusunannyameliputi observasi proyek, studi literatur atau dokumentasi, dan interview pakarpraktisi. Keluaran dari penelitian adalah, (1) profil (2) struktur organisasi, (3) sumber pendanaan,(4) tahapan utama milestones boc girder, (5) prosedur assembly girder(6) prelifting (7) lifting
منابع مشابه
Aerodynamic Admittance Research on Wide-body Flat Steel Box Girder
Abstract: Aerodynamic admittance is a key parameter affecting the analysis accuracy of the bridge buffeting response. However, few articles have covered the issue of the wide-body flat box girder with much smaller depth-width ratio (such as 1/12 studied in this paper). Therefore, to explore the real buffeting force of the wide-body flat box girder, experiments of the static force coefficients a...
متن کاملLessons Learned in the Design and Erection of Box Girder Bridges from the West Gate
The West Gate Bridge, intended to span the Yarra River in Australia, collapsed during its third year of construction in 1970. Investigation into the project revealed numerous issues in the bridge's design and construction. The West Gate Bridge is one of a number of box girder bridges built during the mid 2 0 th century, and was one of four to fail in a three year period. An overview of the desi...
متن کاملEconomical Steel Plate Girder Bridges
As a service to the bridge design profession, Bethlehem Steel has conducted hundreds of studies of steel plate girder bridges using its Preliminary Bridge Girder Optimization Program. The program is unique because it optimizes plate girder designs on the basis of least cost, not least weight. An evaluation of many study results leads to a number of guidelines which are offered in this paper. Wh...
متن کاملSubpart R—Steel Erection
(5) The limited access zone shall remain in place until the wall is adequately supported to prevent overturning and to prevent collapse unless the height of wall is over eight feet, in which case, the limited access zone shall remain in place until the requirements of paragraph (b) of this section have been met. (b) All masonry walls over eight feet in height shall be adequately braced to preve...
متن کاملProject Evaluation Method Based on Matter-Element and Hierarchy Model
Abstrak Evaluasi proyek selalu menjadi kunci dari manajemen proyek rekayasa. Evaluasi proyek adalah pekerjaan yang kompleks yang melibatkan banyak faktor. Hasil evaluasi akhir selalu dipengaruhi langsung oleh definisi indeks evaluasi yang bervariasi dan bobot yang terkait. Makalah ini terutama mempelajari penilaian kemampuan para ahli dan pembentukan sistem evaluasi proyek indeks dalam tinjauan...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IKRA-ITH teknologi
سال: 2022
ISSN: ['2654-8046', '2580-4308']
DOI: https://doi.org/10.37817/ikraith-teknologi.v7i2.2324