METHODICAL APPROACH TO FORMATION OF MECHANISM FOR CONSTRUCTION COMPANY COMPETITIVE ABILITY INCREASE
نویسندگان
چکیده
منابع مشابه
a new approach to credibility premium for zero-inflated poisson models for panel data
هدف اصلی از این تحقیق به دست آوردن و مقایسه حق بیمه باورمندی در مدل های شمارشی گزارش نشده برای داده های طولی می باشد. در این تحقیق حق بیمه های پبش گویی بر اساس توابع ضرر مربع خطا و نمایی محاسبه شده و با هم مقایسه می شود. تمایل به گرفتن پاداش و جایزه یکی از دلایل مهم برای گزارش ندادن تصادفات می باشد و افراد برای استفاده از تخفیف اغلب از گزارش تصادفات با هزینه پائین خودداری می کنند، در این تحقیق ...
15 صفحه اولConstruction of Deformation - Mechanism Maps for Metals and Solid Solution Alloys a New Approach
A new approach has been introduced to construct deformation-mechanism maps for metals and solid solution alloys. For this purpose two computer programs named DEFOR and GRAPH have been written in BASIC to be run on IBM compatible personal computers. Using these programs, deformation - mechanism maps for a number of pure metals and a solid solution alloy (Ti-6wt% Al) have been plotted and effects...
متن کاملMethodical construction of sustainable SDI nodes
In this position paper, we present our group’s perspective and philosophy on the development of information systems that serve to enable spatial data sharing and spatial data processing in large, heterogeneous environments. We call such systems SDI nodes, as they are the building blocks of information infrastructure in which geo-information plays a role. We clarify our view on SDI, and identify...
متن کاملA Methodical Approach to Hybrid PLL Design
Coherent demodulation in digital wireless communications involves generating a local carrier that is in phase with the received carrier, and then using this local carrier in order to coherently demodulate the received signal. Generation of the local carrier is done via a carrier synchronization Phase Lock Loop (PLL). The receiver also includes a symbol timing synchronization PLL, whose purpose ...
متن کاملMethodical construction of database management systems
Although more and more database management systems are being developed, constructing such systems in an engineering fashion remains an open problem. An engineering attitude towards construction not only tells how to implement a database management system, but also tries to minimize construction time. Hence, the prime objective of an engineering-style construction approach is construction effici...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Bulletin of Bryansk state technical university
سال: 2017
ISSN: 1999-8775
DOI: 10.12737/article_59b11cc8013920.06876284