منابع مشابه
South Africa's cataract surgery rates: why are we not meeting our targets?
Cataract is the leading cause of blindness in South Africa, responsible for about 50% of the prevalence of blindness and identified as a national health priority. The cataract surgery rate (CSR) should be at least 2 000 per million population per year for elimination of cataract blindness. The national CSR target was planned to increase from 1 000 in 2005 to 2 000 in 2010, but since CSRs have f...
متن کاملMeeting our ends by our means: protecting children from SHS in research.
In this issue, we published a paper on sleep bruxism in children exposed to secondhand smoke (see page 392). After publication, we received a letter (below) raising questions about the ethics of the study. Normally, responses to papers are published electronically as Rapid Responses, because we simply do not have page space for extensive discussions between authors and readers. However, we take...
متن کامل[2011 annual summary. Another meeting with our readers].
December has arrived and, following the tradition at the Revista Española de Cardiologı́a (REC), the editorial team has put together its annual reader’s issue. This year we have very important developments to share, as well as challenges for the future of REC. Part of the information in this ‘‘Editor’s page’’ was also presented to the REC editorial committee, and in a condensed form to the Plena...
متن کاملRappaport Furrows on Our Minds : The ASCB Cytokinesis Meeting Burlington
Cytokinesis presents us with two mysteries: how a cleavage furrow is localized to a single, defined place in the cell; and how an accumulation of proteins can deform a perfectly stable ovoid shape to create two new cells (Fig. 1). Scientists working in varied organisms met recently in Burlington, VT, to address these questions. Each question has a simple answer, although those answers turn out ...
متن کاملThe effects of software processes on meeting targets and quality
Firms developing sojtware face increasing pressures to improve product quality, productivity, time to market, and customer satisfaction. As projects increase in size and complexity, and competition grows, firms are reengineering their sofnyare processes. They are adopting more intensive procedures for requirements management, project planning, defect tracking, configuration management, and desi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Nature
سال: 2008
ISSN: 0028-0836,1476-4687
DOI: 10.1038/nj7191-130c