Measuring a Safety Culture: Critical Pathway or Academic Activity?
نویسندگان
چکیده
منابع مشابه
f/sla from learner perspectives: a social activity or a cognitive process
in the past couple of decades sociocultural theory of sla and its implications in efl contexts have attracted attentions of research circles worldwide and aroused some controversies. firth and wagner (1997) have questioned the principles of the cognitive view which gives importance to mental constructs in favor of sociocultural view which highlights social and contextual constructs. but if soci...
15 صفحه اولTowards operationalizing and measuring Traffic Safety Culture
The purpose of this study was to increase our understanding of Traffic Safety Culture (TSC) by identifying its constituent components. A review of existing safety culture literature was conducted. Next, 18 international experts participated in a Delphi Technique to rate candidate TSC components. Corresponding survey items were then developed and pretested. Our final survey instrument was mailed...
متن کاملMeasuring patient safety culture in Taiwan using the Hospital Survey on Patient Safety Culture (HSOPSC)
BACKGROUND Patient safety is a critical component to the quality of health care. As health care organizations endeavour to improve their quality of care, there is a growing recognition of the importance of establishing a culture of patient safety. In this research, the authors use the Hospital Survey on Patient Safety Culture (HSOPSC) questionnaire to assess the culture of patient safety in Tai...
متن کاملMeasuring Patient Safety Culture in Iran Using the Hospital Survey on Patient Safety Culture (HSOPS): an Exploration of Survey Reliability and Validity
Background and Objectives: Patient Safety Culture is increasingly recognized as an essential driver of patient safety. To establish patient safety culture, firstly the current status of the construct should be assessed. Valid assessment of patient safety culture is contingent on the availability of appropriate measurement tools. Hospital Survey on Patient Safety Culture (HSOPS) developed by th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of General Internal Medicine
سال: 2007
ISSN: 0884-8734,1525-1497
DOI: 10.1007/s11606-006-0061-8