Ground vibration is one of the undesirable results of blasting operations. Different methods have been proposed to predict and control ground vibration that is caused by blasting. These methods can be classified as laboratory studies, fieldwork and numerical modeling. Among these methods, numerical modeling is the one which saves time and cuts costs since it takes into account the basic princip...

متن کامل

Implementation of Hyperbolic Tangent Function to Estimate Size Distribution of Rock Fragmentation by Blasting in Open Pit Mines

Rock fragmentation is one of the desired results of rock blasting. So, controlling and predicting it, has direct effects on operational costs of mining. There are different ways that could be used to predict the size distribution of fragmented rocks. Mathematical relations have been widely used in these predictions. From among three proposed mathematical relations, one was selected in this stud...

متن کامل

Whole Body Vibration in Open Pit Mining - A short review

The main objective of this study was to synthesize scientific knowledge in order to characterize Whole Body Vibration (WBV) in open pit mining: sources, measurements methodologies and main effects on health. A review based on PRISMA Statement was done. Inclusion criteria were research on WBV in mining, published after 1990 and written in English. Thirty-three studies were included in the review...

متن کامل

Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines

Estimating the costs of blasting operations is an important parameter in open-pit mining. Blasting and rock fragmentation depend on two groups of variables. The first group consists of mass properties, which are uncontrollable, and the second one is the drill-and-blast design parameters, which can be controlled and optimized. The design parameters include burden, spacing, hole length, hole diam...

متن کامل

Determination of the largest pit with the non-negative net profit in the open pit mines

The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Mining and Metallurgical Institute of Japan

سال: 1979

ISSN: 0369-4194,2185-6729

DOI: 10.2473/shigentosozai1953.95.1097_393