MC4 TIME HORIZON BIAS IN ECONOMIC EVALUATIONS
نویسندگان
چکیده
منابع مشابه
Trust, Cooperation and Time Horizon in Economic Decisions
My paper addresses an issue that is rarely discussed in the economics literature: how does the economic actors’ trust in each other and in the legal and political institutions affect a country’s economic performance? The first part of the paper is an empirical analysis of the interrelationship between confidence in institutions in different countries, the economic actors’ willingness to coopera...
متن کاملGender Bias in Performance Evaluations:
This paper provides new evidence on gender bias in performance evaluations of university teachers. We exploit a quasi-experimental dataset on 19,962 teaching evaluations, where students are randomly allocated to female or male teachers. Despite the fact that neither students’ grades nor self-study hours are affected by the teacher’s gender, we find that in particular male students evaluate fema...
متن کاملGender Bias in Teaching Evaluations
IZA DP No. 11000 SEPTEMBER 2017 Gender Bias in Teaching Evaluations* This paper provides new evidence on gender bias in teaching evaluations. We exploit a quasi-experimental dataset of 19,952 student evaluations of university faculty in a context where students are randomly allocated to female or male instructors. Despite the fact that neither students’ grades nor self-study hours are affected ...
متن کاملTelemedicine: A systematic review of economic evaluations
Background: Telemedicine is an expanded term in health information technology that comprises procedures for transmitting medical information electronically to improve patients’ health status. The objective of this research is to evaluate the cost-effectiveness of telemedicine interventions in various specialty areas. Methods: The Cochrane Library and Centre for Review and Di...
متن کاملThe Finite Horizon Economic Lot Scheduling in Flexible Flow Lines
This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Value in Health
سال: 2007
ISSN: 1098-3015
DOI: 10.1016/s1098-3015(10)68557-9