Material waste minimization techniques in building construction projects
نویسندگان
چکیده
In Ethiopia, the rapid expansion of construction sector has resulted in wastage materials that negatively affect environment, society, and economy. The reason is inefficient waste management strategies practiced projects. Hence, an adequate material strategy required. This study was attempt to identify key techniques can help minimize building Questionnaire surveys, interviews, reviews previous studies related literature were employed gathering relevant data. Seventy 85 questionnaires administered distributed contractors, consultants, clients returned. These data analyzed using relative importance index method. results indicated employing officers for this purpose, prefabricated or off-site production components, appropriate on-site management, incorporating a policy minimization plan identified as measures wastes.
منابع مشابه
Construction Waste Generation in the Iranian Building Industry
Building industry as one of the greatest industries in Iran comprises a significant share of waste generation in the country. Since a large quantity of the generated construction waste is buried due to the lack of a recycling protocol, it leads to an undesired waste of resources and causes severe environmental issues. This paper provides a study on the problem of material loss/construction wast...
متن کاملModeling construction time in Spanish building projects
The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. ...
متن کاملAutonomous Construction with Compliant Building Material
In this paper, we develop an autonomous construction system in which a self-contained ground robot builds a protective barrier by means of compliant pockets (i.e., filled bags). We present a stochastic control algorithm based on two biological mechanisms (stigmergy and templates) that takes advantage of compliant pockets for autonomous construction. The control algorithm guides the robot to bui...
متن کاملMaterial delivery problems in construction projects: A possible solution
Emerging project management methods for construction projects generate new kinds of challenges for the delivery process of materials. The rationale of such methods is to create short-term schedules, based on a constraint analysis of resources, for project tasks. This approach has two requirements for material deliveries: transparency of material availability and short response times in the supp...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The Ethiopian journal of science and technology
سال: 2021
ISSN: ['2312-6019', '1816-3378']
DOI: https://doi.org/10.4314/ejst.v14i1.1