Material requirements planning system infusion
نویسندگان
چکیده
منابع مشابه
Net Change Material Requirements Planning
Defined and evaluated are concepts and characteristics of net change, a method that facilitates replanning and provides timely response to chunge in a transaction-oriented system. (MRP) entail an inherent massive data-handling task. Consequently , batch-oriented MRP systems tend to be untimely in their response to change since replanning can be done only periodically at best, probably once a we...
متن کاملThe early road to material requirements planning
Material requirements planning (MRP) systems became a prominent approach to managing the flow of raw material and components on the factory floor in the late 20th century. Its adoption was not an over night phenomenon, but was a slow progression over many decades. This article chronicles many developments and events during the formative years of MRP, highlighting changes in computer technology ...
متن کاملFocusing material requirements planning (MRP) towards performance
This paper looks at the successes and disappointments of MRP. It studies numerous articles to determine what the key shortcomings of MRP are. Next, it investigates if these failures are correctable, and what the consequences of not correcting these de®ciencies means. This article considers alternatives that have been discussed in the current literature. Last of all this article discusses whethe...
متن کاملA Web-Based Material Requirements Planning Integrated Application
The paper exploits distributed object technology to develop an enterprise application that integrates material requirement planning (MRP) with job shop simulator. The application aims to realize an integrated system that has rapid response to changing requirements and capability to integrate heterogeneous manufacturing facilities. At first, the application accepts the customer’s order and perfo...
متن کامل- 1 - Efficient Lot - Sizing Procedures for Material Requirements Planning Systems
This paper proposes two constructive heuristics for the well-known single-level uncapacitated dynamic lot-sizing problem. The proposed heuristics, called nLPC and nLPC(i), are developed by modifying the average period cost concept from Silver and Meal’s heuristic, commonly known as Least Period Cost (LPC). An improved tie-breaking stopping rule is also proposed in this paper. The computational ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Omega
سال: 1989
ISSN: 0305-0483
DOI: 10.1016/0305-0483(89)90043-1