Material Requirement Planning under Fuzzy Lead Times

This paper proposes a fuzzy multi-objective integer linear programming approach to model a material requirement planning (MRP) problem with fuzzy lead times. We incorporate to the crisp MRP model the possibility of occurrence of each one of the possible lead times. Then, an objective function that maximizes the possibility of occurrence of the lead times is considered. By combining this objecti...

متن کامل

Material Requirement Planning with fuzzy constraints and fuzzy coefficients

Wepropose a new fuzzymathematical programmingmodel for production planning under uncertainty in an industrial environment. This model considers fuzzy constraints related to the total costs, the market demand and the available capacity of the productive resources and fuzzy coefficients for the costs due to the backlog of demand and for the required capacity. The main goal is to determine the mas...

متن کامل

Material planning for production kits under uncertainty

A kit is a specific collection of components and/or tools needed for completing a procedure or producing a product. A multiperiod material planning system for production kits under the demand and procurement lead-time uncertainty is considered when component sharing among kits is plausible. Simulation experiments show that component sharing improves the system’s service measure of average kit a...

متن کامل

A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...

متن کامل

Coordinating lead times and safety stocks under autocorrelated demand

We consider a supply chain in which orders and lead times are linked endogenously, as opposed to assuming lead times are exogenous. This assumption is relevant when a retailer’s orders are produced by a supplier with finite capacity and replenished when the order is completed. The retailer faces demands that are correlated over time – either positively or negatively – which may, for example, be...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2015

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2015.06.088