منابع مشابه
Train Scheduling Problem - Phase I: A General Simulation Modeling Framework
One of the important problems in management of railway systems is train scheduling problem. This is the problem of determining a timetable for a set of trains that do not violate infrastructure capacities and satisfies some operational constraints. In this study, a feasible timetable generator framework for stochastic simulation modeling is developed. The objective is to obtain a feasible tr...
متن کاملI I I - I I - I I I I I . I I I I I I I I _ I Robust Sequential Confidence Intervals for the Behrens - Fisher Problem
متن کامل
Benchmark structural control problem for a seismically excited highway bridge-Part I: Phase I Problem definition
Department of Civil Engineering, The City College of the City University of New York, T-121 Steinman Hall, Convent Avenue at 140th Street, New York, NY 10031, U.S.A. Earthquake Engineering Research and Test Center, Guangzhou University, Guangzhou, Guangdong, China Department of Civil and Environmental Engineering, Rice University, Houston, TX 77005, U.S.A. Department of Mechanical Engineering a...
متن کاملSufficiency and duality for a nonsmooth vector optimization problem with generalized $alpha$-$d_{I}$-type-I univexity over cones
In this paper, using Clarke’s generalized directional derivative and dI-invexity we introduce new concepts of nonsmooth K-α-dI-invex and generalized type I univex functions over cones for a nonsmooth vector optimization problem with cone constraints. We obtain some sufficient optimality conditions and Mond-Weir type duality results under the foresaid generalized invexity and type I cone-univexi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sympozjum
سال: 2021
ISSN: 2544-3283,2543-5442
DOI: 10.4467/25443283sym.21.004.13717