Manpower planning: Early warning

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Longitudinal Manpower Planning Models

Several manpower planning models are presented that exploit the longitudinal stability of manpower cohorts. The manpower planning process is described along with the problem of identifying and obtaining various types of longitudinal data. An infinite horizon linear program for calculating minimum cost manpower input plans is found to have a straightforward solution in a great many cases and to ...

متن کامل

Linking Strategic Planning and Management Manpower Planning

A well-developed strategic plan is merely an expensive report. It becomes a viable tool when it is placed in the hands of a manager competent to execute the plan. While the link between corporate strategic planning and management manpower planning seems obvious, a recent Business Week article suggests that companies are only now seriously trying to develop formal ties between the two systems. ̂ ...

متن کامل

Manpower Planning with Uncertain Requirements

This paper examines a longitudinal model of a manpower system in which the demands for effective manpower is determined by the state of a ! aiite Markov chain, and there are delays in training an adequate supply of effective manpower. We present an operational method of calculating optimal appointment policies. This calculation can in turn be used to find the equilibrium operating rules for the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Bulletin of the Royal College of Psychiatrists

سال: 1981

ISSN: 0140-0789,2514-9954

DOI: 10.1192/s0140078900012669