Project management planning on sub structure area, very important to ensure efficient and effective construction projects. This research was purposes managing the material precast pile sloof using requirement (MRP) method in flat residence West Sumatera. The scope were lot for (LFL) bar bending schedule contingency plan (to minimize wasted material). results of analysis study, implementation MRP (LFL technique) consists cost shop drawing, which Rp.1,488,562,000,00; by technique Rp.1,477,837,249,00; realization combining LFL is Rp.1,478,143,808,00. Calculation quantity reinforcing steel better than method. Using more efficient, because it makes remaining after cutting calculated properly.
منابع مشابه
Material Requirement Planning under Fuzzy Lead Times
This paper proposes a fuzzy multi-objective integer linear programming approach to model a material requirement planning (MRP) problem with fuzzy lead times. We incorporate to the crisp MRP model the possibility of occurrence of each one of the possible lead times. Then, an objective function that maximizes the possibility of occurrence of the lead times is considered. By combining this objecti...
متن کاملMaterial Requirement Planning with fuzzy constraints and fuzzy coefficients
Wepropose a new fuzzymathematical programmingmodel for production planning under uncertainty in an industrial environment. This model considers fuzzy constraints related to the total costs, the market demand and the available capacity of the productive resources and fuzzy coefficients for the costs due to the backlog of demand and for the required capacity. The main goal is to determine the mas...
متن کاملSupply chain master planning considering material-financial flows
In this study, tactical decisions considering the material and financial flows in a supply chain have been made. To achieve these aims and some effective solutions, a multi-objective mathematical model proposed for an integrated supply chain master planning problem. The multi-product, multi-period and capacitated supply chain network has three objective functions. Two first objective functions ...
متن کاملNet Change Material Requirements Planning
Defined and evaluated are concepts and characteristics of net change, a method that facilitates replanning and provides timely response to chunge in a transaction-oriented system. (MRP) entail an inherent massive data-handling task. Consequently , batch-oriented MRP systems tend to be untimely in their response to change since replanning can be done only periodically at best, probably once a we...
متن کاملA Distributed Object Based Integrated System for Material Requirement Planning and Job Shop Simulator
The paper presents an enterprise application that integrates material requirement planning (MRP) with job shop simulator using distributed object technology. The application aims to realize an integrated system that has rapid response to changing requirements and capability to integrate heterogeneous manufacturing facilities. At first, the application accepts the customer’s order and performs m...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Jurnal Ilmiah Poli Rekayasa
سال: 2023
ISSN: ['1858-3709', '2685-3922']
DOI: https://doi.org/10.30630/jipr.18.2.288