Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach
نویسندگان
چکیده
Resource constrained project scheduling problems (RCPSPs) are complex optimization that aim to minimize completion time after considering limited resources and precedence-related activities with known durations. However, due the dynamic nature of real-world applications, activity durations vulnerable change. In addition, resource demands along availability at any stage a can also vary disruptions, which compel practitioners re-think existing methodologies. Consequently, mitigate conjoint effect those uncertainties and/or this paper proposes real-time reactive approach. To deal uncertain durations, chance based approach is followed, later solved by an advanced meta-heuristic approaches called IGFBIS IGFBID. After solving exhaustive list stochastic RCPSP instances, proves efficacy proposed approaches, proven be more useful uncertainty or disruption while executing real-life projects.
منابع مشابه
A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملa multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
this paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. the net present value (npv) maximization and making span minimization are this study objectives. and since this problem is considered as complex optimization in np-hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Access
سال: 2021
ISSN: ['2169-3536']
DOI: https://doi.org/10.1109/access.2021.3063766