"MANAGING THE DURATION OF THE OPEN-PIT COAL MINE PROCESS CYCLE"
نویسندگان
چکیده
منابع مشابه
Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran
Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...
متن کاملRetail Inventory: Managing the Canary in the Coal Mine!
Retail inventory is a closely watched statistic by retailers as well as their investors, lenders and suppliers. Retailers not only benefit from inventory, but also bear the cost of excess inventory. Investors, lenders and suppliers interpret this statistic for signs of the retailer’s health, future sales prospects, and impending costs. This paper shows that inventory turnover, a commonly used m...
متن کاملA new algorithm for the open-pit mine scheduling problem
For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Vestnik of Kuzbass State Technical University
سال: 2020
ISSN: 1999-4125
DOI: 10.26730/1999-4125-2020-4-60-67