Managing Risk in Motion Picture Project Development

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Managing Risk in Motion Picture Project Development

Movies are produced as unique prototypic media content to serve a highly uncertain demand. Film producers have to address the consumption risk while their projects are still in their development phase. This paper provides a literature review of key risk dimensions of movie projects and how to control them. The interviews conducted with movie producers have made it possible to compare the indust...

متن کامل

Managing Underperformance Risk in Project Portfolio Selection

We consider a project selection problem where each project has an uncertain return with partially characterized probability distribution. The decision maker selects a feasible subset of projects so that the risk of the portfolio return not meeting a specified target is minimized. To model and evaluate this risk, we propose and justify a general performance measure, the Underperformance Riskines...

متن کامل

Development of a Generic Risk Matrix to Manage Project Risks

A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...

متن کامل

Managing Automotive Product Development

The new product development (NPD) is the process by which a new product idea is conceived, investigated, taken through the design process, manufactured, marketed and serviced. In Automotive Engineering these related to the product realization process (PRP) which consists of five phases: "Plan and Define Program", "Product Design and Development", "Process Design and...

متن کامل

Project Milestones for Managing Risk in Software Development Outsourcing: A Real Options Perspective

Organizations are increasingly turning to outsourcing for software development, in part, to control cost and lower the likelihood of project failure. However, application outsourcing is not without risk. Milestones coupled with gateway reviews are a common mechanism for controlling these risks. Yet, the benefit of milestones must be assessed in light of their associated costs. This paper uses r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Media Business Studies

سال: 2009

ISSN: 1652-2354,2376-2977

DOI: 10.1080/16522354.2009.11073496