Managing Product Variants by Project Centralization
نویسندگان
چکیده
منابع مشابه
Managing Automotive Product Development
The new product development (NPD) is the process by which a new product idea is conceived, investigated, taken through the design process, manufactured, marketed and serviced. In Automotive Engineering these related to the product realization process (PRP) which consists of five phases: "Plan and Define Program", "Product Design and Development", "Process Design and...
متن کاملManaging Virtual Product Development team: A Review
Although there are many potential benefits associated with the use of virtual product development teams, exploiting these benefits requires an appropriate management. Managing virtual product development team is a critical issue as many of these teams fail to accomplish their goals. Review of previous literature shows that body of knowledge in managing virtual product development teams is fragm...
متن کاملManaging Product Variants in a Software Product Line with PTC Integrity
At the same time, many product development organizations today are burdened with a wide array of disparate application lifecycle management (ALM) tools acquired over time and incrementally bundled together to automate the myriad of high-ceremony development processes. The resulting environment is one fraught with redundancy, inefficiency, error, escalating costs, compliance issues and lack of v...
متن کاملManaging Product Line Variability by Patterns
Software product lines have a demonstrated potential for cost-effective development of software families. Product lines have to support and coordinate variabilities between the different members of the product family. However, it is also known that the management of these variabilities and the concurrent evolution of product line architecture and single products are still challenging tasks [1]....
متن کاملManaging Software Projects by Structured Project Planning
This study is based on the Structured Process Model formalism previously proposed by the same authors, and describes some techniques for scheduling an execution plan which conforms to the chosen process but adapts to all the potential changes of value of specific variables of the project. The executive plan is generated by means of Incremental Refinements. Each increment is the consequence of o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Lecture Notes on Software Engineering
سال: 2014
ISSN: 2301-3559
DOI: 10.7763/lnse.2014.v2.122