Management of Site Evaluation: A Lesson Learnt of 10 MW HTGR Experimental Power Reactor (RDE) Project Site Licensing
نویسندگان
چکیده
Abstract In 2013, a pre-project activity of Experimental Power Reactor (RDE Project) was started. The reactor type is High Temperature Gas-cooled (HTGR) with 10 MWth capacity. At present the project has been postponed due to some reason, however, there an important stage that achieved, regarding site evaluation process obtain permits from Regulatory Body (BAPETEN). Site critical will guarantee safety nuclear facilities natural and human induced external events as well population environment facility accidents. for RDE same large NPP project, considering at time were no specific regulations considered graded approach mini-scale NPP. includes two stages, namely 1). Evaluation Program (SEP) Management System (MSSE) Approval 2) Approval. SEP intended establish scope criteria safety. Whereas managerial instrument makes top priority in each evaluation. BATAN owner delivered document MSSE BAPETEN on March 10, 2014. These documents intensively discussed by determine agreement evaluation, management aspects based considerations. technical must be evaluated are seismicity, volcanic hazard, geotechnical foundation, meteorology, hydrology, events, dispersion distribution. This approved 2, 2015. Considering very wide various fields competence need supporting data this can not done only experts, it collaborate institution have related aspect. experts involved come Meteorology Geophysics Agency (BMKG) seismic meteorological aspects, Geospatial Information (BIG) support geospatial ground movements/deformation, Geological Survey Center (PSG) geological structures, Volcanology Disaster Mitigation (PVMBG) catalog University geotechnical, foundation hydrology Centers evaluating topography, dispersion, dose assessment, distribution, emergency preparedness, technology aspects. Data acquisition activities such geophysics, drilling, mapping, satellite imagery digitizing processes contracted through third parties guidance developed Expert Team. limited financial resources availability, order achieve effectiveness all activities, special organization formed control Chairman Top Management. submitted stages. first administrative completeness declared administratively complete November 15, second step assessed acceptability site. lasts quite long intensive. Finally, permit issued January 23, 2017. valuable lessons during are: 1) It require understanding perception between applicant regulator licensing process; establishment implementation effective organization; 3) controlling schedule.
منابع مشابه
European ITER Site Studies: Lessons Learnt in Safety and Licensing
On June 28 th 2005, an agreement was reached amongst the ITER parties on the selection of the European Site of Cadarache in France. As consequence, the ITER generic site safety assessment had to be adapted to the French requirements in order to initiate the licensing process. It is precisely in this point that Europe has been working through the European ITER Site Studies programme. The main ob...
متن کاملDevelopment and Evaluation of a Real Time Site-Specific Inter-Row Weed Management System
ABSTRACT- A real-time, site-specific, machine-vision based, inter-row patch herbicide application system was developed and evaluated. The image resolution was 640 × 480 pixels covering a total area of 350 mm x 240 mm of a field composed of four quadrants of 350 mm x 60 mm each. The image frames were processed by LabView® and MatLab®. The developed algorithm, based on weed coverage ratio and seg...
متن کاملExtracting Technical Specifications of a Solar Panel Type to Design a 10 MW Hybrid Power Plant
This paper focuses on the design of a 10 MW hybrid power plant using the technical specifications (data sheet) of an industrial solar panel. The main purpose was to find out the exact electrical properties of the solar panel specialy with conjunction to its temperature, to optimize overall output energy. We first describe the most important types of solar power plants and afterwards focus on el...
متن کاملOn-site Management of Frostbite in the Himalayas
Introduction: Frostbite is a common debilitating condition seen in travelers and residents at high altitudes. Emergent on-site management is warranted in the absence of institutionalized care and compromised evacuation facilities. This prospective, observational study assessed the outcome of on-site emergent management in low-resource, high altitude healthcare setups in the fie...
متن کاملEconometric Analysis on the Site "Lesson Pulse"
In this article the site “Lesson pulse” is considered, as the tool allowing the teacher to receive the objective information on a course and results of a lesson in a mode online. However adequate interpretation for results of such interrogations is impossible, while we will not separate true students from others. Besides, interpretation for results of interrogations and the decision-making, gro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of physics
سال: 2021
ISSN: ['0022-3700', '1747-3721', '0368-3508', '1747-3713']
DOI: https://doi.org/10.1088/1742-6596/2048/1/012042