Management of flow assurance project risk

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of interactions among barriers in project risk management

In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...

متن کامل

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

Project risk management

Purpose – The aim of this article is to develop an understanding of the issues related to risk management in digital library projects as well as techniques for mitigating risk in these projects. Design/methodology/approach – Using evidence from other research in the area, this article outlines the major risk issues within a project and then defines a model for mitigating risk within a project. ...

متن کامل

The role of Real option in e-business Risk management: The case of E-treasury project

Implementing information technology projects requires a calculated process to prevent failure. At the same time application of information technology in organizations faces various potential risks. Exploring information technology environment in organizations reveals the potential risks and provides a structure for comprehensive risk management. There are various methods available for risk mana...

متن کامل

The role of Real option in e-business Risk management: The case of E-treasury project

Implementing information technology projects requires a calculated process to prevent failure. At the same time application of information technology in organizations faces various potential risks. Exploring information technology environment in organizations reveals the potential risks and provides a structure for comprehensive risk management. There are various methods available for risk mana...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Japanese Association for Petroleum Technology

سال: 2017

ISSN: 0370-9868,1881-4131

DOI: 10.3720/japt.82.423