Maintenance-State Assessment Model for Building Maintenance Forecasting
نویسندگان
چکیده
This study aims to provide maintenance-state assessment model for forecasting of building maintenance condition. The selected institutions the were state funded hospitals and schools (14 functional out 23 general 2 3 tertiary schools). In this study, considering shortcomings most widely accepted condition survey protocol (CSP) 1 matrix, that is suitable small projects defect based, developed a large management system based building’s was analogous CSP matrix. Two types ratings used are priority assessment. These two criteria then multiplied determine rating score (BMRS). 3x3 matrix evaluating maintenance-state. It also found 25% buildings in “good condition” requiring only planned maintenance; 68.75% “fair monitoring 6.25% “serious attention”
منابع مشابه
An integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system
Production planning and maintenance are two important problems in manufacturing systems. Despite the relationship exists between these two problems due to sudden failures and production capacity occupied by maintenance activities, each of these problems planned separately and as a result program and model efficiencies reduce in the real world. The aim of integrated production and maintena...
متن کاملA Practical Self-Assessment Framework for Evaluation of Maintenance Management System based on RAMS Model and Maintenance Standards
A set of technical, administrative and management activities are done in the life cycle of equipment, to be located in good condition and have proper and expected functioning. This is refers to be, maintenance management system (MMS). The framework and models of assessment in order to enhance effectiveness of a MMS could be proposed in two categories: qualitative and quantitative. In this resea...
متن کاملMaintenance management decision model for preventive maintenance strategy on production equipment
In industries, Preventive Maintenance (PM) is not a new practice to minimise the sudden breakdown of production machine. PM will be performed at predetermine intervals to provide a balance between failure cost and component utilisation (aging). However, most of PM interval is based on experience or original equipment manufacturer (OEM) recommendations. Consequently, the benefits from PM are not...
متن کاملBi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Archives of current research international
سال: 2022
ISSN: ['2454-7077']
DOI: https://doi.org/10.9734/acri/2022/v22i7538